Jacky Line Handle Complex Project for Prestigious Theatre

Posted on 7th January 2016

Featuring: Jacky Line Group

Jacky Line Handle Complex Project for Prestigious Theatre

Jacky Line have successfully completed the handling of a complex project for the Cameri Theatre in Tel Aviv. The China National Theatre have been performing Richard the 3rd by William Shakespeare at the Cameri and Jacky Line have handled the import and return of all the equipment for the show from China to Israel and back again.

The project, contracted by The National Theatre of China and the Cameri Theatre in Israel, called for air freight door-to-door service, mounting, dismantling, delivering, and the positioning of the equipment at it final destination at the Cameri, all within a rigid time frame. In total, 20tns of stage equipment was handled.

Photos from the Cameri Theatre premises showing various stages of the project are shown below and please click here to read an article published in the Israeli daily newspaper, Haaretz on the performance of the renowned Shakespeare play.

http://www.jackyline.com